Home / Resources / Risk Register Template
Free template

ISO 27001 Risk Register
Template.

Prepare · Protect · Perform

Track and manage cyber risks across your organisation with a ready-to-use register, aligned with ISO 27001.

Quick answer: An ISO 27001 risk register template is a structured log of your cyber risks, with the likelihood, impact, rating, owner and treatment for each one. This free template is aligned to ISO 27001 risk assessment, so it is ready to show an auditor.
Performance analytics displayed on a laptop screen, representing risk tracking and reporting
ISO 27001 aligned
TRACK · ASSESS · MANAGE
Why It Matters

Visibility you can act on.

A risk register turns scattered concerns into a single, prioritised view your whole team can work from.

Central Visibility

Keep every identified risk, owner, and status in one place instead of scattered spreadsheets and inboxes.

ISO 27001 Aligned

Structured to match the risk assessment and treatment expectations of ISO 27001 and similar frameworks.

Audit-Ready

Show auditors and stakeholders a clear, maintained record of how risks are identified and treated.

Guide

What goes in an ISO 27001 risk register template

A cyber risk register is the single place where you record risks, decide what to do about them and show that you are managing them over time.

The ISO/IEC 27001 standard requires a defined risk assessment process (clause 6.1.2) and a risk treatment process (clause 6.1.3), and expects the results to be documented. A register is the simplest way to keep that evidence in one place.

What each risk entry records

  • The risk description and the asset affected
  • The threat and the vulnerability behind it
  • Likelihood and impact, which give a risk rating
  • The treatment decision (treat, tolerate, transfer or avoid) and the controls chosen
  • The risk owner, current status and review date

Keeping the register current

Review the register on a schedule and after major changes such as a new system, a new supplier or an incident. A register that is never updated is the first thing an auditor questions.

How to use it

Using the risk register in practice

A risk register only helps when the entries are specific and somebody owns them. Start with your ten most important systems and data sets, then write two or three concrete risks for each. "Customer records in the billing database are backed up but the backup has never been restored" can be scored and fixed. "Data loss" cannot.

Score every risk against the same written scale, usually 1 to 5 for likelihood and for impact, with each level defined in dollars, downtime or people affected. Record the current controls, then decide what happens next: reduce the risk, accept it, transfer it or avoid it. Accepted risks need a named person with the authority to accept them.

  1. List your key systems and data sets.
  2. Write specific risks and name an owner for each.
  3. Score likelihood and impact on a written scale.
  4. Record the treatment decision and a target date.
  5. Book a quarterly review and keep dated notes as evidence.

Link each treated risk to a control in your Statement of Applicability and to the matching information security policy. For reporting risk to the board, see our cyber governance and strategy service, and use the ISO 27001 internal audit checklist to test the register before your certification audit.

FAQ

Cyber risk register template questions

What is a cyber risk register?

A cyber risk register is a structured log of your cyber risks. For each risk it records what could go wrong, how likely and how damaging it is, who owns it and what you have decided to do about it.

How often should a cyber risk register be reviewed?

At planned intervals, commonly at least once a year, and whenever something significant changes, such as a new system, a new supplier or a security incident.

Does ISO 27001 require a risk register?

ISO/IEC 27001 requires documented risk assessment and risk treatment results rather than a document called a risk register. A register is the most common way to meet that requirement.

Who should own the risks in a risk register?

Each risk needs one named owner who has the authority to act on it, usually a business or system owner rather than the person who maintains the spreadsheet. Accepting a risk should also be a named decision by someone with enough authority to accept it.

Get access to our Risk Register Template

Fill in your details and we'll send the template straight to your inbox.

Thanks — check your inbox for a message from Cyber Compliance Pro with your Risk Register Template.

We may occasionally send you helpful updates — no spam, no mass emails, just relevant insights you'll appreciate.

ISO 27001 risk register: what auditors expect to see

An ISO 27001 risk register is the working record behind your risk assessment. Auditors look for each risk to have an owner, a likelihood and impact rating, a chosen treatment and a review date. They also check that the register links to your Statement of Applicability, so every control you claim is tied to a risk it reduces.

This ISO 27001 risk register template is built around those points. Fill in the assets and threats that apply to your business, score each risk, and record the treatment plan. Revisit the register after any major change and at least once a year, so it reflects how the business really runs.

Once the register is in place, use our ISO 27001 internal audit checklist to test that it is being followed. For the full path to certification, read our guide to ISO 27001 certification.

Need Help Getting Started?

Not sure how to use it?

Our consultants can walk you through populating and maintaining your risk register — or handle it for you as part of a broader engagement.